Sloane Physics Laboratory front entryway

This project provides an exterior renovation to the Sloane Physics Laboratory (SPL), including repairs to masonry, roof, and fire escapes as well as restoring the appearance of the building.

Construction schedule

May 2020 to November 2021

Impact
  • The passageway between Sloane Physics and Sterling Chemistry Laboratories will be partially fenced off and pedestrian access will remain open.
  • Anticipated disruptions include noise, dust, and vibration.