Sloane Physics Lab Front Exterior
Sloane Physics Lab Exterior Restoration:

Exterior renovation to Sloane Physics Laboratory to repair masonry, roof, and fire escapes, and restore the appearance of the building.

Construction Schedule:

May 2020 - November 2021

Impact:
  • Passage way between Sloane and Sterling Chemistry Lab will be partially fenced off; pedestrian access will remain open.
  • Anticipated disruptions include noise, dust, and vibration.